Golden Tulip Vivaldi – Replacement of Chiller

Earlier during the year, the air conditioning strategy of the property was reviewed and decision had been reached to replace the aging R22 chillers. A number of options using VRF units, Chillers, DX units or a combination of systems were being considered.

After reviewing the various options it was decided that the room units would be changed to Heat Pump VRF systems as part of the overall refurbishment of the property. This is an ongoing project and earmarked to be completed during the early parts of next year.

Since the decision on the public areas was not yet finalised, at the onset of summer, a project was hastily undertaken to replace one of the two old chillers feeding the public areas of the Hotel since this had developed irreparable faults and was jeopardising the overall guest comfort. In addition, due to the age of the chillers, a substantial cost was being incurred periodically for the upkeep of these units.

The new chiller for the public areas was sized similar to one of the existing units and a direct replacement was made. From monitoring effected by the clients over the early summer months, it was observed that the one new unit was sufficient to provide all the cooling required by the hotel (thereby demonstrating the inefficiencies of the older units where two in parallel were hardly sufficient to cater for the cooling requirements) and resulted in a cost saving of over €20,000 during these first months of operation. This does not take in to consideration the maintenance costs normally incurred during this time of the year.

It is envisaged that the payback period of this new chillier shall be less than 2 years.



Posted on Wednesday, 25 September 2013
News:

Camilleri and Cuschieri have been chosen as the MEP Consultants for the New Island Hotels Tourist Complex at Hal Ferh, Ghajn Tuffieha - C&C Consulting Engineers have completed in the name of their Clients, Bank of Valletta Limited, the first part of a larger project of installing Photovoltaic Panels  - 

C&C Engineers win a Green Award for their MEP design Of Golden Sands Resort and Spa - Camilleri and Cuschieri win Tender for Design of PV Systems and Intelligent lighting systems for the Private Schools Association - 

Professor Joseph Mifsud, Ing. Carmel Cuschieri of Camilleri and Cuschieri Consulting Engineers and Hoter Ltd were the proud winners of the 11th edition of the Malta Engineering Excellence Awards (MEEA) 2012 - 

Camilleri and Cuschieri Consulting Engineers were responsible for the design and supervision of all of the MEP works associated with the project including the Electrical, Mechanical and Plant for the Lifts as well as for the refurbishment of the Lascaris Ditch.  - 

This was not just another project done by C&C as designing services for radio and television studios is a rare and unique opportunity especially when this is done for the number one radio and TV station on the Island.  - 

The first 2013 activity for Camilleri and Cuschieri staff was held on the 2nd February. We went to the Badger raceway to challenge each other in a Badger Karting race. - 

The University inaugurated an €8 million state-of-the-art IT Services building, Rector Juanito Camilleri – an IT expert and a prime campaigner for added funds for the University – said this investment would not have materialised if EU funds had not been made available by the Government. - 

The new state-of-the-art building of the Faculty of Information and Communication Technology was made possible through European Regional Development Fund and Government of Malta funding, amounting to around €17 million. The aim behind the building is to provide the University of Malta with a Faculty of ICT geared for excellent grade education and for interacting with national and international ICT players, on both academic and industrial levels, and from both research and collaborative perspectives. - 

And here we go… it is time for another activity… - The University of Malta have just completed the refurbishment of the lighting and HVAC systems of the library. With the new extended opening hours these systems play a very important part in the overall building efficiency and hence its running costs. C & C were tasked with this refurbishment and the objective was to optimise the design to reduce running costs.  - 

Summer is here and also the first heat wave so we decided to have an indoor activity this time to stay in an air-conditioned environment.  - Earlier during the year, the air conditioning strategy of the property was reviewed and decision had been reached to replace the aging R22 chillers. A number of options using VRF units, Chillers, DX units or a combination of systems were being considered.  - 

The new building for the University's Faculty of ICT was recently inaugurated - December is here and everyone starts feeling the festive fever coming. - 

The University of Malta have just completed the refurbishment of the air conditioning installation for the Faulty of Engineering.  - Visit to MP3-Italia stand at the Mostra Convegno EXPOCOMFORT 2014 in Milan - 

The University of Malta has just opened its new Home Economics Lab at the Junior College campus. C & C were entrusted with the holistic design of the lab including both the MEP installations as well as furniture and appliances. The overall layout was jointly established with the Home Economics Department at the Junior College as well as the UOM Estates and Works Department. - 

Over the summer period, Radisson BLU St Julian's embarked on a project to change their aging R22 water cooled chillers to R410 air cooled heat pumps.  - 

CSL is a Systems Integrator in Malta specializing in the following:  - During the Annual Squash Presentation which was held on Saturday 30th August - 

Camileri and Cuschieri have just participated in the Young Engineers Employer of the Year Award organised by CIBSE in association with ASHRAE -